by admin | Aug 19, 2026 | Featured, News
The Washington County Service Authority (WCSA) has received the 2025 Virginia Optimization Program Gold Standard of Excellence from the Virginia Department of Health’s Office of Drinking Water, marking the 15th time the utility has earned the distinction. The...
by admin | Aug 20, 2025 | Capital Projects
The Flatwood Acres Waterline Extension Project will bring public water service to areas of Flatwood Acres Road. The Virginia Department of Health’s Office of Drinking Water has awarded funding for the project, which is currently in the design phase. WCSA expects the...
by admin | Aug 20, 2025 | Capital Projects
The Buffalo Pond Waterline Extension Project will bring public water service to areas of Buffalo Pond Road. The Virginia Department of Health’s Office of Drinking Water has awarded funding for the project, which is currently in the design phase. WCSA expects the...
by admin | Aug 20, 2025 | Capital Projects
The Lee Highway Corridor Sewer Improvements Project is a multi-phase project that will bring public sewer service to the Lee Highway corridor between Oak Park Drive and Exit 10. The project is funded by USDA Rural Development, Virginia Department of...
by admin | Aug 11, 2025 | In The Pipe - Summer-Fall, In The Pipe Released, News
Certain types of businesses and industries are required to have a backflow prevention assembly or backflow elimination method to protect the drinking water distribution system from contamination should a backflow incident occur. These businesses and industries...